SPCC plan template: what goes in a self-certified plan

Short answer

A self-certified SPCC plan needs a certification page, a facility description and diagram, a container inventory, secondary containment and drainage controls, transfer and overfill procedures, inspection and testing procedures with records, training, security, and spill response with a contact list. Tier I facilities can use EPA's free Appendix G template; Tier II facilities need a full plan meeting 40 CFR 112.7 and 112.8.

An SPCC (Spill Prevention, Control, and Countermeasure) plan is the written plan 40 CFR Part 112 requires of facilities that store more than 1,320 gallons of oil aboveground where a spill could reach water. If you're a qualified facility, you can write and certify it yourself. Here's every section a self-certified plan needs, and where each requirement comes from.

Two ways to do it yourself

Some states publish their own Tier II templates. EPA notes some states don't allow self-certification at all, so check yours first.

Sections a self-certified SPCC plan needs

SectionWhat it coversRule
Certification pageThe owner or operator's eight statements, signature and date§ 112.6(b)(1)
Management approvalApproval at a level that can commit the resources§ 112.7
Qualified facility determinationAggregate capacity, largest container, 3-year discharge history§ 112.3(g)
Facility description and diagramLayout, each fixed container and its contents, transfer stations, piping§ 112.7(a)(3)
Oil inventoryType of oil and capacity of each container; estimate for mobile/portable ones§ 112.7(a)(3)(i)
Discharge prevention and drainageRoutine handling, transfers, drainage controls§ 112.7(a)(3)(ii)–(iii), § 112.8(b)
Failure analysisDirection, rate of flow and total quantity of oil from each likely failure§ 112.7(b)
Secondary containmentGeneral containment, plus sized containment for bulk storage: largest container plus rain freeboard§ 112.7(c), § 112.8(c)(2), (c)(11)
Bulk storage controlsCompatible containers, overfill prevention, leak correction, buried/partly buried tanks§ 112.8(c)
Transfers and pipingLoading racks, buried piping, valves and supports§ 112.7(h), § 112.8(d)
Inspections and recordsWritten procedures, signed records kept 3 years, integrity testing per industry standard§ 112.7(e), § 112.8(c)(6)
TrainingOil-handling staff trained; accountable person named; annual briefings§ 112.7(f)
SecurityHow you secure and control access to oil handling, processing and storage areas, master flow and drain valves, pump starter controls, out-of-service piping, lighting§ 112.7(g)
Response and reportingCountermeasures, disposal, contact list, what to report§ 112.7(a)(3)(iv)–(vi), (a)(4)–(5)
Review and amendmentsFive-year review log; amendments within six months of a change§ 112.5
Cross-reference tableWhere each requirement is addressed§ 112.7

Where blank templates fall short

After you sign

Keep the plan at the facility if it's attended at least four hours a day (§ 112.3(e)); you don't file it with EPA. If oil reaches water, call the National Response Center at 1-800-424-8802 (40 CFR 110.6).