How to self-certify an SPCC plan

Short answer

Yes, if your facility is a qualified facility (10,000 gallons or less aboveground and no disqualifying spills in three years). You prepare the plan yourself and sign eight certification statements in place of a Professional Engineer (40 CFR 112.6), but you can't self-certify impracticability determinations or environmental-equivalence alternatives, and some states don't allow self-certification.

If your facility is a qualified facility under 40 CFR 112.3(g), the owner or operator can certify the SPCC plan instead of a Professional Engineer (40 CFR 112.6). Here's what you're signing, what you can't do on your own, and what keeps the plan current.

The eight statements you certify (§ 112.6(b)(1))

  1. You're familiar with the requirements of Part 112.
  2. You have visited and examined the facility.
  3. The plan was prepared in accordance with accepted and sound industry practices and standards, and with Part 112.
  4. Procedures for required inspections and testing have been established.
  5. You will fully implement the plan.
  6. The facility meets the qualification criteria in § 112.3(g)(2).
  7. The plan does not deviate from any requirement as allowed by § 112.7(a)(2) and § 112.7(d), and doesn't include measures under § 112.9(c)(6) for produced water containers.
  8. The plan and the people responsible for it have the full approval of management, and the owner or operator has committed the resources to fully implement it.

What you can't self-certify

In practice: if a dike is too small or a tank has no containment, fix it before you certify, or list it in the plan as not yet fully operational with installation details and dates (§ 112.7).

Keeping it current

WhenWhatRule
A change that affects the potential for a dischargeAmend within 6 months; implement within 6 months after that; self-certify the technical amendment§ 112.5(a), § 112.6(b)(2)
Every 5 yearsReview and evaluate the plan, and sign a statement that you did§ 112.5(b)
Monthly / annuallyInspections per your written procedures; signed records kept 3 years§ 112.7(e)
At least once a yearDischarge prevention briefing for oil-handling staff§ 112.7(f)(3)
Aggregate goes over 10,000 galPE-certified plan within 6 months§ 112.6(b)(2)(ii)

Where to keep it

At the facility if it's attended at least four hours a day, otherwise at the nearest field office, available for EPA's on-site review during normal working hours (§ 112.3(e)). You don't file it, but EPA can ask for it after a reportable discharge (§ 112.4).

Can I write my own SPCC plan if I'm not a qualified facility?

You can draft it, but it won't be valid until a licensed Professional Engineer reviews and certifies it (§ 112.3(d)). Many owners do the legwork (inventory, diagram, procedures) themselves and pay a PE to review, visit and certify, which can cut down the time the PE has to bill. See who has to certify an SPCC plan.

Before you start, check that your state allows self-certification. EPA notes that some don't.