For farms, fleets, contractors and shops with 1,320 to 10,000 gallons of oil
Your self-certified SPCC plan, built from your tanks, not a blank template.
List your tanks, drums and oil-filled equipment and answer questions about your site. We check whether you're a Tier I or Tier II qualified facility, do the containment math, and write the full 40 CFR 112 SPCC Plan with its certification page, inspection checklists, training log and spill response card, as Word files.
- Qualified facility test from the rule text (40 CFR 112.3(g)): what counts toward 10,000 gallons, and what doesn't
- Containment checked area by area: largest container plus rain freeboard
- If you need a Professional Engineer instead, we tell you and don't sell you the kit
What a self-certified SPCC plan has to do, and what we build for you
1 · Prove you qualify
Aggregate aboveground capacity of 10,000 gallons or less and no disqualifying discharges in the three years before you sign. Your Plan records the numbers and the test.
2 · Meet 112.7 and 112.8
Inventory, drainage and failure analysis, sized secondary containment, overfill prevention, transfers, piping, inspections, security, training and response, with a cross-reference table.
3 · Be carried out
Signed monthly inspections kept three years, an annual briefing, a 5-year review. The checklists and logs come with the Plan.
How to write a self-certified SPCC plan
- Check that the rule applies. Add up aboveground oil containers of 55 gallons or more. Over 1,320 gallons, and a spill could reach water? You need a Plan.
- Confirm you can self-certify. 10,000 gallons or less and no disqualifying spills in three years makes you a qualified facility: Tier I, or Tier II if any container is over 5,000 gallons.
- Size the containment. Each bulk container's containment must hold the largest container plus rain freeboard. Fix anything short before you certify.
- Write the Plan. Inventory, drainage and failure analysis, transfer and security procedures, inspections, training, spill response, and a cross-reference to 40 CFR 112.7.
- Certify and implement. Walk the site, complete the diagram, sign the eight 112.6(b)(1) statements, train staff, and start monthly inspections.
SpillPlan does steps 1 to 4: enter or upload your container list (10–15 minutes), see your free check in seconds, then unlock, complete the yellow “Fill in” items only you can, draw the diagram, sign and implement.
SpillPlan vs a blank template vs a consultant
| SpillPlan | Blank template | Consultant | |
|---|---|---|---|
| Price | $549 one time | Free (EPA, Tier I only) to $299 | Typically $2,000–$4,000 for Tier II |
| Qualified facility check | Computed from your inventory | You work it out | Yes |
| Containment math | Per area, with rain freeboard | Worksheet | Yes |
| Written for your site | Yes: your tanks, drainage, transfers | You write it | Yes |
| Site visit | No, you walk the site | No | Usually |
Prices from public pages checked 2026-11-15: EPA Tier I template free (fill-in form, Tier I only); OH Consultant $299 (Word template you complete); USTContractors guide $2,000–$4,000 (typical consultant fee for a Tier II plan). Over 10,000 gallons, a spill history, or containment you can't build? You need a Professional Engineer.
Pricing
Complete kit
$549 one time
- All five Word files, written for your facility
- Rebuild when you add or move tanks
- Free qualified-facility check before you pay
Secure checkout by Stripe.
What we don't do
We prepare documents. We're not engineers and this isn't an engineering certification or legal advice. You, the owner or operator, visit the site, check every statement, sign the Plan and carry it out. Some states don't allow self-certification; check yours. Oil production, drilling and offshore facilities aren't covered.
Built from the regulation itself
Every Plan is drafted against the primary sources below. Where your answers don't cover something, the Plan leaves a yellow “Fill in” item that says what goes there, instead of guessing.
- 40 CFR 112.1 — General applicability (1,320-gallon and 55-gallon thresholds, exemptions)
- 40 CFR 112.3 — Plan requirement, PE certification, qualified facility (Tier I / Tier II) criteria
- 40 CFR 112.6 — Qualified facility Plan requirements and self-certification
- 40 CFR 112.7 — General requirements for SPCC Plans
- 40 CFR 112.8 — Onshore facilities (excluding production): drainage, bulk storage, transfers
- 40 CFR 112.5 — Amendments and the 5-year review
- 40 CFR 110.6 — Notice to the National Response Center (800-424-8802)
- EPA — Qualified facility determination
- EPA — Tier I qualified facility SPCC Plan template
- EPA — SPCC Guidance for Regional Inspectors (2013)
- EPA — SPCC and WRRDA fact sheet for farms
SPCC plans: common questions
Who needs an SPCC plan?
A non-transportation facility that stores, uses or handles oil needs a Spill Prevention, Control, and Countermeasure Plan if, because of its location, a discharge could reasonably be expected to reach navigable waters or adjoining shorelines, and it has more than 1,320 U.S. gallons of aboveground oil storage capacity (counting only containers of 55 gallons or more) or more than 42,000 gallons of completely buried capacity not covered by the UST rules. Location is judged without considering dikes or other man-made structures (40 CFR 112.1(d)(1)(i)).
Source: 40 CFR 112.1 — General applicability (1,320-gallon and 55-gallon thresholds, exemptions).
What is a Tier II qualified facility?
A facility with 10,000 gallons or less of aggregate aboveground oil storage capacity that, in the three years before the Plan is self-certified, has had no single discharge to water over 1,000 gallons and no two discharges over 42 gallons each within any 12-month period (natural disasters, acts of war and terrorism excepted). If it also has no aboveground container over 5,000 gallons, it is a Tier I qualified facility; if any container is over 5,000 gallons, it is Tier II (40 CFR 112.3(g)).
Sources: 40 CFR 112.3 — Plan requirement, PE certification, qualified facility (Tier I / Tier II) criteria; EPA — Qualified facility determination.
Can I write and self-certify my own SPCC plan?
Yes, if the facility is a qualified facility. Instead of a Professional Engineer, the owner or operator certifies the Plan (40 CFR 112.6). A Tier I facility may use EPA's Appendix G template or a Plan that meets 112.6(b); a Tier II facility prepares a Plan meeting 112.7 and subpart B or C. EPA notes that some states don't allow self-certification, so check with your state.
Sources: 40 CFR 112.6 — Qualified facility Plan requirements and self-certification; EPA — Qualified facility determination.
What does the owner or operator certify?
Eight statements (40 CFR 112.6(b)(1)): you're familiar with Part 112; you visited and examined the facility; the Plan follows accepted and sound industry practice and Part 112; inspection and testing procedures are established; you'll fully implement the Plan; the facility meets the qualified facility criteria; the Plan uses no environmental-equivalence or impracticability deviations; and management has approved the Plan and committed the resources.
Source: 40 CFR 112.6 — Qualified facility Plan requirements and self-certification.
How big does secondary containment need to be?
For bulk storage containers, big enough for the entire capacity of the largest single container plus sufficient freeboard for precipitation (40 CFR 112.8(c)(2)). EPA's inspector guidance prefers sizing freeboard for the 25-year, 24-hour storm and says 110% of the largest container is often a reasonable rule of thumb; document the method you use.
Sources: 40 CFR 112.8 — Onshore facilities (excluding production): drainage, bulk storage, transfers; EPA — SPCC Guidance for Regional Inspectors (2013).
Do I send my SPCC plan to EPA?
No. Keep a complete copy at the facility if it's attended at least four hours a day, otherwise at the nearest field office, and make it available to EPA for on-site review during normal working hours (40 CFR 112.3(e)).
Source: 40 CFR 112.3 — Plan requirement, PE certification, qualified facility (Tier I / Tier II) criteria.
How often must an SPCC plan be reviewed or amended?
Review and evaluate it at least once every five years and record the review (40 CFR 112.5(b)). Amend it when a change in design, construction, operation or maintenance materially affects the potential for a discharge: prepare the amendment within six months and implement it within six months after that (112.5(a)). Self-certifiers certify their own technical amendments (112.6(b)(2)).
Sources: 40 CFR 112.5 — Amendments and the 5-year review; 40 CFR 112.6 — Qualified facility Plan requirements and self-certification.
Who do I call if oil reaches water?
The National Response Center, 1-800-424-8802 (40 CFR 110.6). Separately, a discharge of more than 1,000 gallons, or two of more than 42 gallons within 12 months, must be reported in writing to the EPA Regional Administrator within 60 days (40 CFR 112.4).
Sources: 40 CFR 110.6 — Notice to the National Response Center (800-424-8802); 40 CFR 112.4 — Reporting discharges over 1,000 gallons or 2 × 42 gallons to the EPA Regional Administrator.
Are farms different?
Yes. Under the Water Resources Reform and Development Act of 2014 (as amended in 2016), a farm with less than 2,500 gallons of aggregate aboveground storage, or more than 2,500 but less than 6,000 gallons with no reportable discharge history, doesn't need a Plan; one with more than 6,000 but less than 20,000 gallons, no tank over 10,000 gallons and no reportable discharge history may self-certify. Farm containers of 1,000 gallons or less on separate parcels don't count. EPA notes the 6,000-gallon threshold may be adjusted, so check its current farm guidance.
What does SpillPlan give me for $549?
Five editable Word files built from your facility: the full SPCC Plan (certification page, qualified facility determination, container inventory, containment calculations and failure analysis, transfer, drainage, security and response procedures, 5-year review log, a 40 CFR 112.7 cross-reference), inspection checklists and logs, a training log, a spill response card and a "before you certify" checklist. You see your free qualified-facility check, containment sizing and inspection schedule before you pay.
Is this an engineering certification?
No. We prepare documents; the owner or operator who signs is responsible for the Plan and for carrying it out. If your facility isn't a qualified facility, or you'd need an impracticability determination or an alternative measure, a Professional Engineer must certify, and we'll tell you so instead of selling you the kit.
Facts last checked 2026-11-15.
More questions people ask
- Do I need an SPCC plan?
- How many gallons require an SPCC plan?
- Does a 1,000-gallon tank need a plan?
- Do farms need an SPCC plan?
- What is the 110% containment rule?
- Tier I vs Tier II qualified facilities
- Can I write my own SPCC plan?
- What inspections are required?
- How often must the plan be updated?
- What's the fine for not having a plan?