Tier I vs Tier II qualified facilities under the SPCC rule
Short answer
A qualified facility has 10,000 gallons or less of aboveground oil storage and no disqualifying spills in the past three years, so the owner can self-certify the SPCC plan. It's Tier I if no single aboveground container is over 5,000 gallons, and Tier II if any container is over 5,000 gallons (40 CFR 112.3(g)).
A Tier II qualified facility can prepare and self-certify its own SPCC plan instead of hiring a Professional Engineer. The test is in 40 CFR 112.3(g). Here it is step by step, with what counts and what doesn't.
The test
- Aggregate aboveground oil storage capacity of 10,000 U.S. gallons or less (§ 112.3(g)(2)).
- Clean discharge history: in the three years before you self-certify (or since becoming subject, if newer), no single discharge to navigable waters or shorelines over 1,000 gallons, and no two discharges over 42 gallons each within any 12-month period. Discharges caused by natural disasters, acts of war or terrorism don't count.
- Tier I or Tier II: if no individual aboveground container is over 5,000 gallons, you're Tier I (§ 112.3(g)(1)). If any container is over 5,000 gallons, you're Tier II.
What counts toward the aggregate
- Only containers of 55 gallons or more (§ 112.1(d)(2)(ii)). Count shell capacity, not how full they are.
- Count bulk storage tanks, drums, totes, mobile refuelers and oil-filled operational equipment (hydraulic systems, transformers, generator base tanks).
- Excluded: permanently closed containers, motive power containers (a vehicle's or machine's own fuel tank), hot-mix asphalt, heating oil used solely at a single-family residence, pesticide application equipment, and milk containers (§ 112.1(d)(2)(ii)). Completely buried tanks subject to all of the UST technical rules (40 CFR 280 or an approved state program) are also exempt (§ 112.1(d)(4)).
Worked examples
| Facility | Counted capacity | Largest | Result |
|---|---|---|---|
| Contractor yard: 6,000-gal diesel AST, 1,000-gal double-wall gasoline, 8 drums, 2 totes, 300-gal used oil, 500-gal fuel trailer, 120-gal hydraulic system | 8,910 gal | 6,000 gal | Tier II |
| Fleet shop: two 2,000-gal diesel tanks, 500-gal used oil, 10 drums | 5,050 gal | 2,000 gal | Tier I |
| Fuel dealer: two 8,000-gal tanks | 16,000 gal | 8,000 gal | PE-certified plan required |
Assumes a spill could reach water and no disqualifying discharges. The first row is the sample facility in our test kit.
Tier I vs Tier II at a glance
| Tier I | Tier II | |
|---|---|---|
| Aggregate aboveground capacity | 10,000 gal or less | 10,000 gal or less |
| Largest single aboveground container | 5,000 gal or less | Any container over 5,000 gal |
| Discharge history (3 years) | No single discharge to water over 1,000 gal, and no two over 42 gal each within 12 months | |
| Plan format | EPA's Appendix G template, or a plan meeting § 112.6(b) (§ 112.6(a)(1)) | A full plan meeting § 112.7 and subpart B or C (§ 112.6(b)(3)) |
| Failure analysis | Direction and quantity of a spill (§ 112.6(a)(3)(i)) | Direction, rate of flow and quantity (§ 112.7(b)) |
| Overfill prevention | A system or documented procedure for each container, regularly tested (§ 112.6(a)(3)(iii)) | At least one of the devices in § 112.8(c)(8), such as a high-level alarm or pump cutoff |
| Who certifies | The owner or operator, with the eight statements in § 112.6(a)(1) or (b)(1). A PE must certify any environmental-equivalence alternative or impracticability determination (§ 112.6(b)(3)–(4)); the Appendix G template can't include them at all. | |
| If the facility grows | A container over 5,000 gal: move to a Tier II plan within 6 months; over 10,000 gal aggregate: PE plan (§ 112.6(a)(2)) | Over 10,000 gal aggregate: PE-certified plan within 6 months (§ 112.6(b)(2)(ii)) |
Most of the day-to-day obligations, such as containment sized for the largest container plus rain, inspections with signed records, annual briefings and the five-year review, are the same for both tiers.
Farms
Farms have their own thresholds under the Water Resources Reform and Development Act of 2014: a farm with more than 6,000 but less than 20,000 gallons, no tank over 10,000 gallons and no reportable discharge history may self-certify, and farm containers of 1,000 gallons or less on separate parcels don't count. Check EPA's farm fact sheet for current thresholds.
Find out where you stand, free
SpillPlan's free check tells you whether the SPCC rule applies, whether you can self-certify, how big your containment needs to be and what to inspect. If you need a Professional Engineer, it says so. The full plan kit is $549 if you want it.
Next questions
- How to self-certify an SPCC plan
- SPCC plan template: what goes in a self-certified plan
- Who has to certify an SPCC plan?
- How many gallons of oil require an SPCC plan?
Sources
- 40 CFR 112.1 — General applicability (1,320-gallon and 55-gallon thresholds, exemptions)
- 40 CFR 112.3 — Plan requirement, PE certification, qualified facility (Tier I / Tier II) criteria
- 40 CFR 112.6 — Qualified facility Plan requirements and self-certification
- EPA — Qualified facility determination
- EPA — SPCC and WRRDA fact sheet for farms