What inspections does an SPCC plan require?

Short answer

You must inspect and test each aboveground container for integrity on a regular schedule set by an industry standard, check the outside of containers frequently, inspect aboveground piping and valves, and keep signed inspection records with the plan for three years (40 CFR 112.7(e) and 112.8(c)(6), (d)(4)). For most shop-built tanks, owners follow STI SP001, which uses monthly and annual owner inspections plus periodic formal inspections by a certified inspector.

The SPCC rule doesn't hand you a fixed calendar. It requires inspections and tests "in accordance with written procedures that you or the certifying engineer develop for the facility" (40 CFR 112.7(e)), with the frequency and type of integrity testing set by industry standards (§ 112.8(c)(6)). In practice that means picking a standard, writing its schedule into your plan, and following it.

What the rule requires you to inspect

WhatRequirementRule
Aboveground containersTest or inspect for integrity on a regular schedule and after material repairs; frequency, type and inspector qualifications set by industry standards; keep comparison records; inspect supports and foundations§ 112.8(c)(6)
Outside of containers and diked areas"Frequently" inspect for deterioration, discharges, or oil in diked areas§ 112.8(c)(6)
Aboveground valves, piping and appurtenancesRegularly inspect flange and expansion joints, valve glands and bodies, catch pans, supports, valve locks and metal surfaces§ 112.8(d)(4)
Buried pipingIntegrity and leak test when installed, modified, relocated or replaced; inspect any section that's exposed§ 112.8(d)(1), (d)(4)
Liquid level sensing devicesRegularly test for proper operation (Tier I: test the overfill system or procedure)§ 112.8(c)(8)(v), § 112.6(a)(3)(iii)
Rainwater in dikesInspect before draining; record each event§ 112.8(c)(3)
Qualified oil-filled equipment (if using the alternative)Inspection or monitoring program to detect failure or a discharge§ 112.7(k)(2)(i)

The usual standard: STI SP001

For shop-built tanks, portable containers and small field-erected tanks, most facilities follow the Steel Tank Institute's SP001 standard, which EPA's tank inspection page says may be used to meet the integrity testing requirement. SP001 has four kinds of activity:

SP001 sorts tanks into three categories by whether they have spill control (such as a dike or an outer wall) and a continuous release detection method (such as interstitial monitoring or an elevated bottom you can see). A tank with both is Category 1, the lowest risk, with the longest intervals; a tank with neither is Category 3. Field-erected tanks usually follow API 653 instead. STI publishes its monthly and annual checklists free and says to keep completed checklists for at least 36 months, which lines up with the SPCC three-year rule.

Records

Keep the written procedures and a record of each inspection and test, signed by the appropriate supervisor or inspector, with the plan for three years (§ 112.7(e)). Records kept under your normal business practices count. An unsigned checklist, or one signed by someone the plan doesn't name, is a common inspection finding.

A simple monthly routine

  1. Walk every tank, drum and tote. Look for leaks, stains, corrosion, bulging, and damaged supports.
  2. Check dikes and pallets for oil or water, cracks and open drain valves.
  3. Check the interstice of double-wall tanks, and level gauges and alarms.
  4. Look over aboveground piping, valves and hoses at transfer points.
  5. Confirm the spill kit is stocked. Sign and date the checklist and file it with the plan.

Related questions

How long must SPCC inspection records be kept?

Three years. 40 CFR 112.7(e) requires written inspection procedures and signed records kept with the plan for three years; records kept under usual business practices are acceptable.

Who can do the monthly inspection?

Under STI SP001, the periodic (monthly and annual) inspections are visual and done by the owner's inspector; they don't need a certified inspector. Formal external and internal inspections do.