What inspections does an SPCC plan require?
Short answer
You must inspect and test each aboveground container for integrity on a regular schedule set by an industry standard, check the outside of containers frequently, inspect aboveground piping and valves, and keep signed inspection records with the plan for three years (40 CFR 112.7(e) and 112.8(c)(6), (d)(4)). For most shop-built tanks, owners follow STI SP001, which uses monthly and annual owner inspections plus periodic formal inspections by a certified inspector.
The SPCC rule doesn't hand you a fixed calendar. It requires inspections and tests "in accordance with written procedures that you or the certifying engineer develop for the facility" (40 CFR 112.7(e)), with the frequency and type of integrity testing set by industry standards (§ 112.8(c)(6)). In practice that means picking a standard, writing its schedule into your plan, and following it.
What the rule requires you to inspect
| What | Requirement | Rule |
|---|---|---|
| Aboveground containers | Test or inspect for integrity on a regular schedule and after material repairs; frequency, type and inspector qualifications set by industry standards; keep comparison records; inspect supports and foundations | § 112.8(c)(6) |
| Outside of containers and diked areas | "Frequently" inspect for deterioration, discharges, or oil in diked areas | § 112.8(c)(6) |
| Aboveground valves, piping and appurtenances | Regularly inspect flange and expansion joints, valve glands and bodies, catch pans, supports, valve locks and metal surfaces | § 112.8(d)(4) |
| Buried piping | Integrity and leak test when installed, modified, relocated or replaced; inspect any section that's exposed | § 112.8(d)(1), (d)(4) |
| Liquid level sensing devices | Regularly test for proper operation (Tier I: test the overfill system or procedure) | § 112.8(c)(8)(v), § 112.6(a)(3)(iii) |
| Rainwater in dikes | Inspect before draining; record each event | § 112.8(c)(3) |
| Qualified oil-filled equipment (if using the alternative) | Inspection or monitoring program to detect failure or a discharge | § 112.7(k)(2)(i) |
The usual standard: STI SP001
For shop-built tanks, portable containers and small field-erected tanks, most facilities follow the Steel Tank Institute's SP001 standard, which EPA's tank inspection page says may be used to meet the integrity testing requirement. SP001 has four kinds of activity:
- Monthly periodic inspection by the owner's inspector, a visual walk-around using STI's monthly checklist. No certified inspector needed.
- Annual periodic inspection by the owner's inspector, adding items such as foundations, coatings, grounding and vents.
- Formal external inspections by a certified inspector, and for some tanks formal internal inspections or leak tests, at intervals set by the tank's size and category in the SP001 table.
SP001 sorts tanks into three categories by whether they have spill control (such as a dike or an outer wall) and a continuous release detection method (such as interstitial monitoring or an elevated bottom you can see). A tank with both is Category 1, the lowest risk, with the longest intervals; a tank with neither is Category 3. Field-erected tanks usually follow API 653 instead. STI publishes its monthly and annual checklists free and says to keep completed checklists for at least 36 months, which lines up with the SPCC three-year rule.
Records
Keep the written procedures and a record of each inspection and test, signed by the appropriate supervisor or inspector, with the plan for three years (§ 112.7(e)). Records kept under your normal business practices count. An unsigned checklist, or one signed by someone the plan doesn't name, is a common inspection finding.
A simple monthly routine
- Walk every tank, drum and tote. Look for leaks, stains, corrosion, bulging, and damaged supports.
- Check dikes and pallets for oil or water, cracks and open drain valves.
- Check the interstice of double-wall tanks, and level gauges and alarms.
- Look over aboveground piping, valves and hoses at transfer points.
- Confirm the spill kit is stocked. Sign and date the checklist and file it with the plan.
Related questions
How long must SPCC inspection records be kept?
Three years. 40 CFR 112.7(e) requires written inspection procedures and signed records kept with the plan for three years; records kept under usual business practices are acceptable.
Who can do the monthly inspection?
Under STI SP001, the periodic (monthly and annual) inspections are visual and done by the owner's inspector; they don't need a certified inspector. Formal external and internal inspections do.
Find out where you stand, free
SpillPlan's free check tells you whether the SPCC rule applies, whether you can self-certify, how big your containment needs to be and what to inspect. If you need a Professional Engineer, it says so. The full plan kit is $549 if you want it.
Next questions
- How often is SPCC training required?
- How often does an SPCC plan need to be reviewed or updated?
- Does a double-walled tank count as secondary containment?
- SPCC plan template: what goes in a self-certified plan
Sources
- 40 CFR 112.7 — General requirements for SPCC Plans
- 40 CFR 112.8 — Onshore facilities (excluding production): drainage, bulk storage, transfers
- 40 CFR 112.6 — Qualified facility Plan requirements and self-certification
- EPA — Tank inspections (STI SP001 and API 653 as industry standards)
- EPA SPCC Guidance for Regional Inspectors, ch. 7: Inspections, evaluation and testing (2013)
- STI/SPFA — SP001 monthly inspection checklist
- STI/SPFA — SP001 annual inspection checklist
- STI/SPFA SP001 Standard for the Inspection of Aboveground Storage Tanks