Who has to certify an SPCC plan?
Short answer
A licensed Professional Engineer, unless the facility is a qualified facility. For qualified facilities (10,000 gallons or less aboveground and a clean three-year spill history), the owner or operator can certify the plan instead (40 CFR 112.3(d) and 112.6). Either way, the owner or operator stays responsible for carrying the plan out.
Certification is what makes an SPCC plan effective. Section 112.3(d) says a licensed Professional Engineer must review and certify a plan "for it to be effective," except as provided in § 112.6 for qualified facilities. So the question is really whether your facility is a qualified facility.
Two paths
| PE-certified plan | Self-certified plan | |
|---|---|---|
| Who can use it | Any facility | Qualified facilities only: 10,000 gal or less aboveground and no disqualifying discharges in 3 years (§ 112.3(g)) |
| Who signs | A licensed Professional Engineer | The owner or operator |
| Site visit | PE or the PE's agent visited and examined the facility | The owner or operator visited and examined it |
| Standard | Good engineering practice, considering applicable industry standards | Accepted and sound industry practices and standards |
| Alternatives and impracticability | Allowed with the PE's certification (§ 112.7(a)(2), (d)) | Only if a PE certifies that portion (§ 112.6(b)(3)–(4)) |
What the PE attests (§ 112.3(d)(1))
- They're familiar with the requirements of Part 112.
- They or their agent visited and examined the facility.
- The plan was prepared in accordance with good engineering practice, including applicable industry standards, and with Part 112.
- Procedures for required inspections and testing have been established.
- The plan is adequate for the facility.
A sixth statement applies only to produced water containers at oil production facilities. The PE's certification doesn't relieve the owner or operator of the duty to prepare and fully implement the plan (§ 112.3(d)(2)).
What a self-certifying owner attests
Eight statements in § 112.6(b)(1) (or § 112.6(a)(1) for the Tier I template): familiarity with the rule, a site visit, industry practice, established inspection procedures, a commitment to implement, meeting the qualified facility criteria, no deviations that need a PE, and management approval with committed resources. They're explained one by one in how to self-certify an SPCC plan.
Hybrid: PE certifies only part
A qualified facility that needs one alternative, say a tank where sized containment truly isn't practicable, doesn't have to hand the whole plan to a PE. Under § 112.6(b)(4), the PE reviews and certifies just that alternative measure or impracticability determination, and the owner self-certifies the rest. Later technical amendments that touch the PE-certified portion go back to a PE (§ 112.6(b)(2)(i)).
Choosing a PE
Part 112 just says "licensed Professional Engineer." Your state's engineering licensure rules decide whose license is acceptable, so the safe choice is a PE licensed in the state where the facility is, ideally one who writes SPCC plans regularly. EPA's SPCC for Agriculture page links to state PE licensing board contacts.
Related questions
Does the PE have to visit the site?
The PE or the PE's agent must have visited and examined the facility (40 CFR 112.3(d)(1)(ii)). A self-certifying owner certifies that they visited and examined it (112.6(b)(1)(ii)).
Who certifies amendments?
Whoever is allowed to certify the plan. A PE certifies technical amendments to a PE plan (112.5(c)); a self-certifier certifies their own, except amendments to any portion a PE certified (112.6(b)(2)).
Find out where you stand, free
SpillPlan's free check tells you whether the SPCC rule applies, whether you can self-certify, how big your containment needs to be and what to inspect. If you need a Professional Engineer, it says so. The full plan kit is $549 if you want it.
Next questions
- How to self-certify an SPCC plan
- Tier I vs Tier II qualified facilities under the SPCC rule
- How much does an SPCC plan cost?
- How often does an SPCC plan need to be reviewed or updated?