Does a double-walled tank count as secondary containment?
Short answer
Usually, for leaks from the tank itself. EPA's guidance says shop-fabricated double-wall aboveground tanks built to industry standards can satisfy both the general and the sized secondary containment requirements, provided they have overfill protection (an overfill alarm plus an automatic flow restrictor or shutoff) and transfers are constantly monitored. The outer wall doesn't contain overfills from vents, piping or the transfer area.
A double-walled tank is a tank inside a tank, with an interstitial space between them. EPA's inspector guidance (ch. 4, section 4.4.5) says the outer tank "may provide adequate secondary containment for discharges resulting from leaks or ruptures of the entire capacity of the inner storage tank," and that double-walled tanks are still subject to the secondary containment requirements. Whether yours qualifies depends on how it's built and how you fill it.
The conditions EPA lists
EPA memos from 1992 and 2002, summarized in ch. 4, say shop-built double-wall aboveground tanks serve as an equivalent preventive system when:
- The container is shop fabricated.
- The inner tank is a UL-listed steel tank.
- The outer tank is built to a nationally accepted industry standard (for example API, STI or the American Concrete Institute).
- It has overfill prevention to contain overfills from the vents: an overfill alarm and an automatic flow restrictor or flow shut-off.
- All product transfers are constantly monitored.
Instead of item 4, you can provide active or passive secondary containment sized for the typical vent overfill during a transfer. The 2002 memo removed an earlier 12,000-gallon size limit, and the guidance says such tanks, "regardless of size, may generally satisfy" both the general (§ 112.7(c)) and the sized (§ 112.8(c)(2)) containment requirements. EPA adds that double-walled tanks typically don't need extra freeboard for precipitation when the interstice isn't exposed to rain.
What the outer wall doesn't cover
- Vent overfills during filling. Oil pushed out of a vent ends up outside both walls. That's why the overfill alarm and shutoff, or containment for the overfill, are required.
- Piping, hoses, pumps and dispensers outside the tank still need general containment (§ 112.7(c)).
- The loading or unloading area. If tank trucks fill it at a loading rack, § 112.7(h) still applies; otherwise the transfer area needs general containment.
- Openings below the liquid level. EPA notes that double-wall tanks with fittings or a manway below the liquid level may need more containment to meet industry standards or codes such as NFPA 30.
Inspecting a double-walled tank
The integrity requirements in § 112.8(c)(6) still apply. Industry standards such as STI SP001 set the schedule; the monthly owner checklist includes checking the interstice for liquid. If you ever find oil in the interstitial space, the inner tank has failed and needs attention right away.
Bottom line for your plan
If you're relying on a double-wall tank as containment, say so in the plan and list which of the conditions above it meets: the tank standard on the nameplate, the overfill alarm and shutoff (or the alternative containment), and your procedure for attending every delivery.
Find out where you stand, free
SpillPlan's free check tells you whether the SPCC rule applies, whether you can self-certify, how big your containment needs to be and what to inspect. If you need a Professional Engineer, it says so. The full plan kit is $549 if you want it.
Next questions
- What is the 110% secondary containment rule?
- Do generators and belly tanks count toward the SPCC threshold?
- What inspections does an SPCC plan require?
- SPCC plan template: what goes in a self-certified plan
Sources
- EPA SPCC Guidance for Regional Inspectors, ch. 4: Secondary containment and impracticability (2013)
- 40 CFR 112.7 — General requirements for SPCC Plans
- 40 CFR 112.8 — Onshore facilities (excluding production): drainage, bulk storage, transfers
- 40 CFR 112.6 — Qualified facility Plan requirements and self-certification