What's the difference between an SPCC plan and a SWPPP?

Short answer

An SPCC plan is about oil: it's required by 40 CFR 112 when you store more than 1,320 gallons aboveground and a spill could reach water. A SWPPP (stormwater pollution prevention plan) is about stormwater: it's required by a Clean Water Act NPDES stormwater permit, for example for construction disturbing an acre or more or for certain industrial activities. They're triggered independently, so a site can need one, both or neither.

Both plans come from the Clean Water Act and both are about keeping pollutants out of water, which is why they get confused. But they come from different sections of the Act, have different triggers, and cover different risks.

Side by side

SPCC planSWPPP
Full nameSpill Prevention, Control, and Countermeasure PlanStormwater Pollution Prevention Plan
Legal basisClean Water Act § 311(j); 40 CFR Part 112Clean Water Act § 402 NPDES permits; the SWPPP is a condition of the stormwater permit
What it addressesOil spills from containers and equipmentAny pollutant picked up by rain and snowmelt: sediment, metals, nutrients, chemicals, and oil too
Triggered byOil storage over 1,320 gal aboveground (or 42,000 gal buried) where a spill could reach waterConstruction disturbing 1 acre or more (or part of a larger plan that will), or certain industrial activities listed in 40 CFR 122.26(b)(14)
Filed with an agency?No. Kept on site and available for inspection (§ 112.3(e))You file a notice of intent for permit coverage; the SWPPP itself is usually kept on site
Who certifiesA PE, or the owner for qualified facilitiesSet by the permit
Who administersEPA regions (some states run their own tank programs on top)Usually the state, under EPA-authorized permit programs; EPA where it's the permitting authority

Do I need both?

Often, yes. A construction project that disturbs five acres and keeps a 2,000-gallon fuel tank and a few drums on site likely needs a SWPPP under the construction general permit and an SPCC plan for the fuel. A truck terminal or industrial plant with fuel storage can need an industrial stormwater permit and SWPPP plus an SPCC plan. A small shop with 2,000 gallons of oil but no industrial stormwater permit needs only the SPCC plan.

Can one document do both?

You can combine them, but the SPCC rule has a condition: if your plan doesn't follow the order of § 112.7, it must be "an equivalent Plan acceptable to the Regional Administrator" that meets every applicable Part 112 requirement, with a section cross-referencing where each requirement is addressed (§ 112.7, introductory text). Many facilities find it simpler to keep two documents and cross-reference shared pieces like the site map, spill response procedures and inspection schedule.

Where they overlap

For the SPCC side, start with Do I need an SPCC plan?

Find out where you stand, free

SpillPlan's free check tells you whether the SPCC rule applies, whether you can self-certify, how big your containment needs to be and what to inspect. If you need a Professional Engineer, it says so. The full plan kit is $549 if you want it.

Start the free check

Next questions

Sources