Do construction sites need an SPCC plan?
Short answer
Yes, if the site meets the same test as any other facility: more than 1,320 gallons of aboveground oil storage in containers of 55 gallons or more, and a spill could reasonably reach water. Fuel tanks, skid tanks, drums, totes and fuel trailers on site count; the fuel tanks of the equipment itself (motive power containers) don't.
Construction sites, contractor yards and other temporary operations are covered by the same rule as permanent facilities. The definition of "facility" in 40 CFR 112.2 includes mobile ones, and § 112.3(a)(1) has specific language for mobile or portable facilities.
What counts on a job site
| Counts toward 1,320 gal | Doesn't count |
|---|---|
| Skid and portable fuel tanks | The fuel tanks of excavators, loaders, trucks and other equipment (motive power containers) |
| Fuel trailers, lube trucks and mobile refuelers used to fuel equipment | Containers under 55 gallons, such as 5-gallon cans and pails |
| Drums and totes of fuel, hydraulic oil, form oil or used oil | Hot-mix asphalt |
| Generator fuel tanks and light-tower tanks of 55 gal or more |
A tank on a truck that carries fuel to other equipment isn't a motive power container (§ 112.2), so a fuel truck or a pickup transfer tank of 55 gallons or more counts.
One plan that moves with you
You don't need a new plan every time you mobilize. For a mobile or portable facility, "the Plan may be general," and when you move you locate and install the equipment using the discharge prevention practices in the plan (§ 112.3(a)(1)). The plan applies while the equipment is in a fixed, non-transportation operating mode. For mobile or portable containers, the facility diagram can show the storage area where they're kept, and the plan can give an estimate of how many containers, what oil and what capacities you expect (§ 112.7(a)(3)).
Containment on a job site
- Portable tanks, drums and totes: sized secondary containment for the largest container plus freeboard for rain, such as a portable berm or containment pallet, and positioned to prevent a discharge (§ 112.8(c)(11)).
- Mobile refuelers and on-site tank trucks: exempt from the sized containment rules in § 112.8(c)(2) and (c)(11), but still need general containment under § 112.7(c) for the most likely spill, for example sorbents and drain covers kept on the truck, or a berm where they park.
- Fueling equipment: the transfer into a vehicle's tank is covered even though the vehicle's tank isn't (§ 112.1(d)(7)). Your plan's transfer procedures and spill kit are what an inspector looks at here.
Who is responsible on a multi-contractor site?
The rule puts the plan on the owner or operator of the facility (§ 112.3). On a job site where a subcontractor brings and runs its own fuel tanks, that contractor may be the operator of that oil storage. Settle in the contract who prepares the plan and who maintains the containment, and make sure the numbers are counted by whoever is the operator.
Most construction sites disturbing an acre or more also need a stormwater permit and a SWPPP. That's a separate requirement; see SPCC plan vs SWPPP.
Related questions
Do I need a new plan every time we move to a new site?
Not for a mobile or portable facility. 40 CFR 112.3(a)(1) lets the plan be general; each time you move, you locate and install the equipment using the discharge prevention practices in the plan.
Do fuel trucks and fuel trailers need sized containment?
Mobile refuelers are exempt from the sized secondary containment requirements in 40 CFR 112.8(c)(2) and (c)(11), but they still need general secondary containment under 112.7(c), such as a berm, sorbents or a drainage control, sized for the most likely spill.
Find out where you stand, free
SpillPlan's free check tells you whether the SPCC rule applies, whether you can self-certify, how big your containment needs to be and what to inspect. If you need a Professional Engineer, it says so. The full plan kit is $549 if you want it.
Next questions
- How many gallons of oil require an SPCC plan?
- What is the 110% secondary containment rule?
- What's the difference between an SPCC plan and a SWPPP?
- What isn't covered by the SPCC rule?
Sources
- 40 CFR 112.1 — General applicability (1,320-gallon and 55-gallon thresholds, exemptions)
- 40 CFR 112.2 — Definitions (farm, oil-filled operational equipment, mobile refueler)
- 40 CFR 112.3 — Plan requirement, PE certification, qualified facility (Tier I / Tier II) criteria
- 40 CFR 112.7 — General requirements for SPCC Plans
- 40 CFR 112.8 — Onshore facilities (excluding production): drainage, bulk storage, transfers